District-scale graphite project in Northern Québec covering 16,542 ha (165.4 km²), making FCI the largest claim holder in the Tétépisca region.
Less than 10% of the land package drilled and $10 million spent, the project has already outlined a 3.2 Mt NI 43-101 indicated and inferred graphite resource. Substantial expansion upside.
The property shares claim boundaries with Nouveau Monde Graphite’s $3.6B NPV Uatnam Graphite Project, highlighting strong district-scale potential.
In-pit Resource at Lac Gueret South Project (rounded numbers)
Current Resources (as of June 17th, 2019)
| Minerals Resources Category | Tonnage (Mt) | Grade (% Cgr) | Cgr (t) | Cut off |
| Indicated | 1.76 | 17.0 | 299,200 | 6.81% |
| Inferred | 1.53 | 16.4 | 250,200 | 6.81% |
The mineral resource estimates above are described in the technical report entitled, NI 43-101 Technical Report Mineral Resource Estimate on the Lac Gueret South Graphite Property, Quebec, Canada. With an Effective date of June 30th, 2019, by Edward Lyons, PGeo., Florent Baril, ing., and Claude Duplessis, ing.

The Berkwood Graphite Project is immediately adjacent to Nouveau Monde’s $3.6 Billion NPV Uatnam Graphite Mining Project and is likely part of the same geological structure, especially since the grades and metallurgy of both companies graphite is similar. Over the past 6 years the Berkwood Project has been drilled numerous times and has a proven resource of 3.2 million tonnes of indicated and inferred, as per our 43-101 resource report. This resource estimate should be easy to expand as to date only approx 10 % of the properties have been drilled. The Company has numerous other properties with outcropping graphite that have tested as high as 48% graphite. Plans for Drilling in 2026, and are currently conducting airborne geophysical surveys.
Our high-grade, natural graphite
Has Been purified to 99.95%

Project Zones and Outcrop Graphite at Surface: Currently 12 outcrop locations
All 44 drill holes from our first four drill programs have intersected graphite.
Gallery












Bulk Sample: Air separation, No Hydrofluoric Acid
18 Skids – 27 Tons Taken – Using air separation to process the graphite form 17% to 92-96% using Volt Carbon Tech patented process. VOLT analyses of the processed samples demonstrated a 96.1-per-cent purity in graphitic carbon and 98.1 per cent total carbon, as per VOLT news release dated August 16, 2023.
- No Toxic Waste – Reduced Carbon footprint & ESG Friendly
- Separated without water, reagents or chemicals
- Chrystallinity and conductivity maintained
- High grade, large to jumbo flake natural graphite
- At surface graphite better for environment, less waste rock
The Company reported on August 2, 2023 that a sample totalling approximately 27 tonnes of graphitic mineralization was collected from zones 1 and 6 at GEM’s Berkwood graphite property and has since been delivered to VOLT.

